Status of the Illinois site: Response to RFC 116
A one-paragraph status report on the University of Illinois ARPA Network connection in April 1971.
Bouknight, J., "Status of the Illinois site: Response to RFC 116", RFC 156, DOI 10.17487/RFC0156, April 1971, <https://www.rfc-editor.org/info/rfc156>.
@misc{rfc156,
series = {Request for Comments},
number = 156,
howpublished = {RFC 156},
publisher = {RFC Editor},
doi = {10.17487/RFC0156},
url = {https://www.rfc-editor.org/info/rfc156},
author = {J. Bouknight},
title = {{Status of the Illinois site: Response to RFC 116}},
pagetotal = 1,
year = 1971,
month = apr,
} RFC text
Network Working Group J. Bouknight Request for Comments: 156 26 April 1971 Category: G.5 Illinois Obsoletes: None Updates: None Status of the Illinois Site (Response to RFC 0116) As of the date of the report, 26 April, the Illinois Site has complete operational hardware connecting the PDP-11 system with the IMP. Due to much trouble with the Burroughs B6500 computer, final checkout of the operating system plus the network control program for the PDP-11 has been seriously curtailed. Current expectations are: --checkout of the NCP by the latter part of May --installation of the PDP-11 system in Paoli, PA (the operating link between Illinois and Burroughs in Paoli) so that the system will be operational during June [ This RFC was put into machine readable form for entry ] [ into the online RFC archives by Tom McGhan 7/97 ]
AI ELI5
On this page
§1Where the Illinois Site Stood
As of 26 April, the Illinois Site had complete operational hardware connecting the PDP-11 system with the IMP. The report is a response to RFC 116.
Final checkout of the operating system plus the network control program (NCP) for the PDP-11 had been seriously curtailed because of much trouble with the Burroughs B6500 computer.
The wires are connected and working, but the programs that use them are not finished being tested.
§2What Was Expected Next
Two expectations are listed. First, checkout of the NCP by the latter part of May. Second, installation of the PDP-11 system in Paoli, PA, which is the operating link between Illinois and Burroughs, so that the system would be operational during June.
They planned to finish testing by late May and move the machine to a partner location so it works in June.
§3Why a Status Note Mattered
The note has no protocol content. It is a snapshot of a site joining the early network, and it shows that connecting a host involved more than the IMP hardware: an operating system and an NCP also had to be working before the site could take part.
Plugging in is only the first step. The computer also needs the right programs before it can talk to others.