INFN Requirements for an IPng
A research network's priorities: solve address space and routing in parallel, not separately.
Ghiselli, A., Salomoni, D., and C. Vistoli, "INFN Requirements for an IPng", RFC 1676, DOI 10.17487/RFC1676, August 1994, <https://www.rfc-editor.org/info/rfc1676>.
@misc{rfc1676,
series = {Request for Comments},
number = 1676,
howpublished = {RFC 1676},
publisher = {RFC Editor},
doi = {10.17487/RFC1676},
url = {https://www.rfc-editor.org/info/rfc1676},
author = {A. Ghiselli and D. Salomoni and C. Vistoli},
title = {{INFN Requirements for an IPng}},
pagetotal = 4,
year = 1994,
month = aug,
} RFC text
Contents
Network Working Group A. Ghiselli
Request for Comments: 1676 D. Salomoni
Category: Informational C. Vistoli
INFN/CNAF
August 1994
INFN Requirements for an IPng
Status of this Memo
This memo provides information for the Internet community. This memo
does not specify an Internet standard of any kind. Distribution of
this memo is unlimited.
Overview
This document was submitted to the IETF IPng area in response to RFC
1550. Publication of this document does not imply acceptance by the
IPng area of any ideas expressed within. Comments should be
submitted to the big-internet@munnari.oz.au mailing list.
Abstract
This white paper is sent by INFN network team, the Italian National
Institute for nuclear physics, whose network, named INFNet, is a
nationwide network founded to provide the access to existing national
and international HEP laboratory and to facilitate communications
between the researchers. With this paper we would like to emphasize
the key points that we would to consider if charged with IPng plan.
We do not really expect to add original items to the selection, but
we think that it could be useful to submit the opinions and ideas
that come from our network experience.
1. General Requirements
The problems that are to be solved in IP internet are mainly three:
1. address exhaustion
2. flat address space
3. routing efficiency, flexibility and capacity.
The aim of IPng study should be to define a plan that solves all
these problems as a whole and not each of them separately.
The general requirements that we underline for this transition are:
- transparency to the final user: user applications should not be
influenced.
- flexibility: Simplify the suitability to new communication
technology and to topology changes due to new services provided
or to different users needs.
2. Application and Transport Level
Starting from the top of the OSI model, we think that the users
applications should not be influenced by the migration plan. It
means that the TCP (the transport layer) must maintain the same
interfaces and services to the upper layers. Anyway, it is also
necessary to foresee the use of a different transport services. The
possibility to use different transport should be offered to the
applications. Therefore a transport selector field is needed.
3. Network layer: service and address
We assume that the network layer must continue to provide the same
datagram service as IP does. CLNS could be a solution and a reliable
starting point for the IPng. The main advantage is that this
solution has been profitable tested and it is already available on
many systems. It is not, of course, deployed as widely as IPv4 is,
since it is a newer technology, but it is widely configured and and
there is already operational experience. The corresponding address,
the NSAP, is 20 bytes long. It is long enough to scale the future
data network environment. Its hierarchical format can be organized
in a really flexible way, satisfying hierarchical routing and policy
based routing needs and simplifying the distributed administration
and management. A lot of work has been already done in the majority
of the countries in order to define NSAP formats satisfying both the
requirements of administrative delegation and routing performances.
4. Routing protocols
We don't consider the decision about the routing protocol to be
adopted for the IPng to be fundamental. Even if this choice is very
important to obtain good performances, the routing protocols can be
changed or improved at any time, because there is no influence into
the End Systems configuration. Relationships between NSAP
aggregation, hierarchical topology and hierarchical routing algorithm
must be taken into account in IPng plan. These issues could improve
administration and topological flexibility of the IPng and solve the
flat problem of the IPv4. The IPng routing protocols should include
policy-based features. The IPv4 network topology is very complex and
it will continue to enlarge during the transition. It would be very
difficult or impossible to manage it without the "policy" tools. The
multicast capability as well as any other new features that fit in a
datagram network should be supported. Regarding the Source Routing
feature, since we think that it deeply modifies the aim and the
"philosophy" of a connectionless network and it also introduces an
heavy complication in the end nodes and routers software, we don't
consider it a major issue.
5. Layer 2 or communication infrastructure media support.
This is an open field, rapidly changing, then it must be left open to
any evolution. What it should be recommended is to be compatible with
the above network layer.
6. Transition and Deployment
We faced the problem of the transition of the DECNET global network
to DECNET/OSI over CLNS. This activity is now proceeding to the last
step and based on this experience we would underline some points that
we found important during the transition deployment. The transitions
must be planned and developed in a distributed way. This means that
every organization should have the possibility to plan and start
their network migration without loosing connectivity with the
existing global internet. Of course, the compatibility with the IPv4
world must be maintained, this mean that a new generation system must
interwork with both the IPv4 and IPng nodes, using the same
applications.
However, it is important to define a deadline for the backward
compatibility in order to avoid huge software maintenance in the user
systems and a "multi-topology" management. We think that a dual
stack approach could simplify very much the transition, whereas a
translation mechanism would need a widely and deep coordination in
order to maintain the global connectivity during the transition
period. The dual stack is simpler and could be easily developed, but
it is important to push in order to have pure IPng with global
connectivity as soon as possible; this could happen when there are no
more "IPv4 only" hosts.
Indeed, the drawback of the dual stack configuration is that you
continue to suffer for the IPv4 address space exhaustion and that you
must continue to support the IPv4 routing protocols and
infrastructure. We don't think that the tunnel solution to
interconnect the IPv4 isle could give good performances to the users.
Then, it is important to maintain the IPv4 connectivity and the dual
stack software support in the End System software in a determined
timeframe, or the transition will never end.
Security Considerations
Security issues are not discussed in this memo.
Authors' Addresses
Davide Salomoni
INFN-CNAF
National Institute of Nuclear Physics - National Networking Center
V.le Ercolani, 8
40138 Bologna - Italy
Phone: +39 51 6098-260
Fax: +39 51 6098 135
EMail: Salomoni@infn.it
Cristina Vistoli
INFN-CNAF
National Institute of Nuclear Physics - National Networking Center
V.le Ercolani, 8
40138 Bologna - Italy
Phone: +39 51 6098-260
Fax: +39 51 6098 135
EMail: Vistoli@infn.it
Antonia Ghiselli
INFN-CNAF
National Institute of Nuclear Physics - National Networking Center
V.le Ercolani, 8
40138 Bologna - Italy
Phone: +39 51 6098-267
Fax: +39 51 6098 135
EMail: Ghiselli@infn.it
AI ELI5
On this page
§1INFN's View of IPng Requirements
RFC 1676 comes from INFN (Istituto Nazionale di Fisica Nucleare), the Italian National Institute for Nuclear Physics, through its network team. The authors—Ghiselli, Salomoni and Vistoli—represent a nationwide research network providing access to high-energy physics laboratories and facilitating researcher communications.
They submit their experience and ideas from operating this specialized, demanding network. They emphasize that IPng planning should solve address exhaustion, routing efficiency, and the flat address space problem as one integrated challenge, not as separate initiatives.
INFN is a physics research network that has dealt with network transitions before. They want IPng to tackle all the hard problems together.
§2General Requirements and Network Layer Design
INFN's general requirements emphasize transparency to end-user applications (applications should not know about the transition) and flexibility to accommodate new communication technologies and topology changes. At the network layer, INFN recommends that IPng continue to provide datagram service like IP does. They note that CLNS (the OSI Connectionless Network Service) could be an ideal foundation: it has been proven in production, uses 20-byte NSAP addresses (sufficient for future growth), and supports hierarchical addressing for flexible administrative delegation and policy-based routing.
Hierarchical address formats can organize administration and management in ways that satisfy both delegated responsibility and routing performance, solving the flat address space problem that limits IPv4.
Applications should work without knowing the network changed. The network layer should use 20-byte addresses with hierarchical structure so organizations can each manage their own sections.
§3Routing and Transition Strategy
INFN does not consider the routing protocol choice fundamental; routing protocols can be improved or changed without affecting end systems. However, NSAP aggregation, hierarchical topology and hierarchical routing algorithms are key. Policy-based routing is essential for the complex, growing IPv4 network topology. INFN also advocates multicast support and warns against source routing, which complicates software and contradicts connectionless philosophy.
For transition, INFN favors a dual-stack approach over translation mechanisms, based on experience migrating DECnet to DECnet/OSI. Dual stack is simpler to develop and deploy at different rates across organizations. However, it is important to set a deadline for backward compatibility to avoid perpetual maintenance of both stacks; pure IPng with global connectivity should become the goal once there are no IPv4-only hosts.
Routing protocols can change anytime, but address hierarchy and policy-based routing matter a lot. Let each organization switch when ready, but set an end date for running both old and new together.
§4Lessons from DECnet Migration
INFN's experience with the DECnet to DECnet/OSI transition informs all its recommendations. Administrative and network management aspects matter as much as protocol design. Organizations need tools, examples and the freedom to transition at their own pace. However, perpetual dual-stack operation creates problems: address space constraints continue, both routing suites must be supported, and tunneling solutions for IPv4 islands give poor performance.
INFN recommends maintaining IPv4 connectivity and dual-stack support on end systems for a defined timeframe, then retiring it. Without such discipline, the transition will never complete.
Switching networks is not just a technical problem; it is an organizational one. Set clear timelines or the old network will never really go away.